WORK HISTORY
-
18 Years
WORK HISTORY
-
BEL Environmental Engineering – 11 Years
-
CTI and Associates, Inc. – 7 Years
PROFESSIONAL REGISTRATION
-
Certified Geosynthetic Materials Inspector (GCI-ICP)
-
Certified Compacted Clay Liner Inspector (GCI-ICP)
TRAINING
-
Troxler Nuclear Moisture/Density Gauge Operator and Radiation Safety Officer Training
-
ACI Certified
-
40-Hour HAZWOPER Training & 8-hour Refresher.
-
Permit Required Confined Space Entry Certified
-
S.T.A.R.T. Rope Access/Rescue Certification
-
Completed the Allied Consultant Orientation Program
-
Certified Quality Control Manager by the USACE quality control program
QUALIFICATION HIGHLIGHTS
-
Mr. DiGello has over 18 years of experience with environmental construction, including construction supervision, construction quality assurance, and project management
-
He has served as a lead construction quality control technician on numerous landfill, highway, and levee projects. These projects have involved multiple earthwork, geosynthetic, concrete, and piping contractors
-
Responsibilities included communication with State and Federal Agencies, review of State and Federal Regulations, contractor invoicing review/approval, and cost estimates
-
Mr. DiGello has acted as Construction Quality Assurance Engineer for multiple solid and hazardous waste landfill construction, Pennsylvania Department of Transportation, and Army Corp of Engineers projects. Projects included landfill cell/closure construction, landfill gas management systems, landfill leachate management systems, highway geosynthetic construction, levee reconstruction, sedimentation, and erosion control
RELEVANT PROJECT EXPERIENCE
Carbon Limestone, Ohio 2006
Project Manager and CQA Manager during multiple Landfill Gas Expansion Construction events as well as cell construction, final capping, flare, and blower installation. Mr. DiGello managed multiple contractors and CQA technicians performing pipe pressure testing and final capping repairs, coordinated survey, helped prepare as-built record drawings, and prepared the certification reports.
Conestoga Landfill, Pennsylvania 2021 & 2022
Project Manager for 3 landfill cells totaling approximately 13 acres that were fast tracked to keep ahead of operations.
Imperial Landfill, Pennsylvania 2009 – 2021
Mr. DiGello acted as Project Manager for multiple LFG Expansion construction events as well as CQA Manager for temporary capping installation. Mr. DiGello managed multiple contractors coordinated survey, helped prepare as-built record drawings, and prepared the certification reports.
Greenridge Reclamation Landfill, Pennsylvania 2009-2021
Project Manager and CQA Manager for multiple Landfill Gas Expansion Construction events as well as final/temporary capping and flare installation. Mr. DiGello managed multiple contractors and CQA technicians performing pipe pressure testing and final cover repairs, coordinated survey, helped prepare as-built record drawings, and prepared the certification report.
Short Creek Landfill, West Virginia 2016, 2020, & 2021
Project Manager for LFG GCCS Expansion and construction. Mr. DiGello supervised multiple technicians performing pipe pressure testing, submitted weekly reports to the client, coordinated survey, helped prepare as-built record drawings, and prepared the certification report.
Valley View Landfill, Kentucky 2016
Project Manager for LFG GCCS Expansion and construction. Mr. DiGello supervised multiple technicians performing pipe pressure testing, submitted weekly reports to the client, coordinated survey, helped prepare as-built record drawings, and prepared the certification report.
Epperson Landfill, Kentucky 2014-2020
Project Manager for LFG, Cell, & Leachate Tank installation. Mr. DiGello oversaw multiple CQA technicians. He supervised field changes and investigations, reviewed material specifications, ordered all necessary material testing. Assisted in preparing the record as-built drawings and completed the certification reports.
Vienna Junction Industrial Park Landfill, Michigan 2011& 2012
LFG Expansion Construction, acted as Quality Control Manager for the construction events. Mr. DiGello supervised multiple technicians performing pipe pressure testing, submitted weekly reports to the client, coordinated survey, helped prepare as-built record drawings, and helped prepare the certification report. He supervised field changes and investigations, reviewed material specifications.
Countywide Recycling and Disposal Facility, Ohio 2011
Project Manager and CQA manager of the LFG Expansion Construction events, West Slope Stabilization in the remediation area, and a 5-acre cell. Mr. DiGello supervised multiple technicians performing pipe pressure testing, submitted weekly reports to the client, OEPA, and health department, coordinated survey, helped prepare as-built record drawings, and prepared the certification reports. Mr. DiGello supervised field changes and investigations, reviewed material specifications.
Port Clinton Landfill, Ohio 2011 & 2012
LFG Expansion, acted as Quality Control Manager of the LFG System Expansion Construction. Mr. DiGello supervised multiple technicians performing pipe pressure testing, submitted weekly reports to the client, OEPA, and health department, coordinated survey, helped prepare as-built record drawings, and helped prepare the certification report. Mr. DiGello supervised field changes and investigations, reviewed material specifications.
USACE 2008 Degognia Levee Repairs, Murphysboro, Illinois
Acted as Quality Control Manager for the stabilization of earthen Levees for Army Corps of Engineers. Provided construction oversight and testing for the removal of levee failures, lime stabilization of soils, and levee reconstruction. Managed several subcontractors. Was responsible for coordinating with several state and federal agencies. Completed all of the daily USACE quality control paperwork, including DQCRs and all the testing paperwork.
Carleton Farms Landfill, Michigan 2009
Ash Cell & Cell 208, acted as CQA manager and Construction Management of approximately 14 acres total of new cell construction. Managed multiple contractors and CQA technicians who Observed/tested RSL placement, geosynthetic installation, leachate management systems, and protective cover placement. Helped prepare record as-built drawings and draft narrative for certification.
Pennsylvania Department of Transport, I-99 Corridor Acid Rock Drainage Remediation Centre County, Pennsylvania 2007 & 2008
CQA and Construction Management services for several different geosynthetic cover systems for the Pennsylvania Department of Transportation I-99 Immovable Material Slope Cover. Systems included geotextile, reinforced geotextile, geogrid, FML, GCL, and geoweb. Prepared draft narratives and reviewed record drawings for construction certification.
USACE 2010 88th Army RSC stormwater runoff improvements – Acted as Quality Control Manager for the construction of stormwater improvements and facility construction at Ft. Snelling Air Force Base. Responsible for managing multiple contractors. Managed, ordered, and reviewed all the quality control testing of the subsoils, concrete, and asphalt. Helped facilitate a design change that utilized a geogrid stabilization solution in lieu of excavating and replacing large amounts of unsuitable materials. Was responsible for coordinating with several state and federal agencies. Completed all of the daily USACE quality control paperwork, including DQCRs and all the testing paperwork.
Pioneer Crossing Landfill, Pennsylvania 2010 - Current
Final capping and the construction of landfill Cells. Managed multiple contractors and CQA technicians who observed/tested RSL placement, geosynthetic installation, leachate management systems, and protective cover placement. Prepared the certification reports.
White Pines Landfill, Pennsylvania 2011
Acted as Project Manager & CQA manager of approximately 12.5 acres of new cell construction and 18 acres of final capping construction. Managed multiple contractors and CQA technicians who observed/tested RSL placement, geosynthetic installation, leachate management systems, and protective cover placement. Helped prepare record as-built drawings and report for certification.
Wetzel Landfill, West Virginia 2013
Acted as Project Manager for the construction of multiple landfill cells. Managed multiple contractors and CQA technicians who oversaw the placement/installation of recompacted subbase, geosynthetics, protective cover, and leachate collection piping. Prepared the certification reports and assisted in the preparation of record as-built drawings.
Lorain II Landfill, Ohio 2006 & 2021
LFG System Expansion, CQA technician services for the construction of new extraction wells, and header/lateral piping. Observed pipe pressure testing. Helped prepare record as-built drawings. Project Manager of 11-acre cell construction.
American Landfill, Ohio 2006
LFG System Expansion CQA Technician services for the construction of new extraction wells, and header/lateral piping. Observed pipe pressure testing. Helped prepare record as-built drawings. Prepared draft narratives and reviewed record drawings for construction certification.
Ohio EPA, Exit C&D Landfill, Ohio 2010
Subsurface heating event remediation for the Ohio EPA. Served as Site Supervisor during the investigation, and remediation of a subsurface heating event. Worked with the Stark County Health Department and the Ohio EPA to remediate rapid subsidence, quench a subsurface heating event, install a monitoring system, and rehabilitate the Leachate management system.
CLD Landfill, Ohio 2007 - CQA technician services during the construction of a 40-acre soil cap. Observed/tested RSB placement. Helped prepare record as-built drawings for certification.